First Light introduces tiered deposit structure
Responding to the changing times, First Light, the xx-unit Belltown condo tower that will complete in 2023 is now offering a limited time tiered deposit structure:
- 2% at signing
- 2% at 6 months
- 2% at 12 months
- 2% at 18 months
- 2% at 24 months
I hear that just this month a 3-unit combination on the 43rd floor went pending.
As for sales, nearly 300 out of 459 homes are pending.